Fléma Snacks Kft. (Mórahalom) – Transition from low voltage to medium voltage power use
2016-10-21
Plasmapheresis Centre – Székesfehérvár (2016-2017)
2017-07-12

Plasmapheresis Centre – Debrecen (2016-2017)

  • implementation of a 700-m2 Plasmapheresis Centre in an existing building
  • compilation of detailed construction drawings, bidding process for contractor selection, management
  • technical inspection
  • cost of the project: HUF 300 million
Pictures

Pictures