Our services

Low and medium voltage power distribution solutions

Technical consultancy services regarding electric power supply

Operation and maintenance of electrical networks and systems
Power industry planning

Services connected to transformer stations
Implementation services for power networks and systems

Low-to-medium voltage transition

Services related to projects – management and general planning

Project preparation

On-site project management
Preparation of plans, obtaining authority permits

Technical inspection
Project supervision

Revision of plans

About us

Integrated Engineering Solutions Kft. (IES Kft.) was founded in April 2006 to provide complex and customer oriented electric power engineering services for business organisations and institutions. To respond to the needs of the market, we expanded our portfolio with complete project management (implementation) services in the year 2007.

The main values that we offer to our customers in these value-creating processes are our striving for perfection, rich experience and commitment. Since the very beginning, our company has strived to operate flexibly and to high professional standards, based on the exact understanding of customers’ needs.

Recent reference projects

2016-10-21

Fléma Snacks Kft. (Mórahalom) – Transition from low voltage to medium voltage power use

  • end-to-end planning of and permit obtaining for a 22/0.42-kV compact transformer station, project management with the power supplier
  • 22-kV distribution cabinet, c/w metering, a transformer branch-off with a circuit breaker, offering possibility of expansion
  • supply and installation of 1,000-kVA oil immersed transformer and 1,600-A FE distributor
  • routing and connection of existing low voltage cables to the station
  • commissioning of the system after project completion

Pictures

2018-03-10

Cédrusliget Lakópark Kft. – construction of apartments, Szeged (2017- ongoing)

  • modern, organic, 3-6-story apartment buildings on a construction site of 48,000 m2
  • almost 600 different-sized, turnkey flats with own large terraces or balconies
  • underground car park for more than 950 cars + 230 parking places on the street level
  • offices and business-premises
  • environment conscious investment (heating and cooling with geothermal energy produced by local geothermal wells, rate of green area: 40%, park with 3 living water lakes)
  • total renovation of the surrounding roads, pavements, public areas
  • end of the project: 2019, second half of the year
  • our activities in the project: preparation of the investment, general planning, compilation of building permit, project management, technical inspection
  • cost of the project: approx. HUF 30 billion

Pictures