2016-10-21
- end-to-end planning of and permit obtaining for a 22/0.42-kV compact transformer station, project management with the power supplier
- 22-kV distribution cabinet, c/w metering, a transformer branch-off with a circuit breaker, offering possibility of expansion
- supply and installation of 1,000-kVA oil immersed transformer and 1,600-A FE distributor
- routing and connection of existing low voltage cables to the station
- commissioning of the system after project completion
Pictures
2016-10-04
- sizing of cooling machine power supply cables, planning of electric operation and signals
- manufacturing, on-site delivery and on-site commissioning of technology control cabinet
- cabling of cooling machines, pumps and control equipment, routing, connection and commissioning of cables
- interfacing of the electrical system to the existing control technology network
Pictures
2016-10-04
- end-to-end technical preparation, project management with the power supplier
- complete electrical planning of a 22/0.42-kV indoor transformer station, permit obtaining and electrical installation
- 22-kV distribution cabinet c/w metering, transformer with 2 branch-offs
- manufacturing, supply and installation of 1 (one) 1,000-kVA and 1 (one) 630-kVA artificial resin insulated transformer and a dual-supply 1,600-A main distribution cabinet
- standby supply for fire cases, operating at 0.4 kV, c/w an automatic switchover mechanism, for the supply of security consumers
- end-to-end commissioning and management of usage permit obtaining process
Pictures
2016-10-04
- preparation of detailed drawings about electric power networks, systems and lighting
- installation of a power distribution network, manufacturing, supply and installation of distribution cabinet
- sizing and installation of LED lighting, in accordance with interior design requirements
- end-to-end commissioning and documentation of electric power network