{"id":8912,"date":"2016-10-03T13:39:36","date_gmt":"2016-10-03T13:39:36","guid":{"rendered":"https:\/\/iesolutions.hu\/linamar-hungary-nyrt-oroshaza-transzformatorallomas-korszerusitese\/"},"modified":"2022-12-14T23:18:00","modified_gmt":"2022-12-14T23:18:00","slug":"linamar-hungary-nyrt-oroshaza-transzformatorallomas-korszerusitese","status":"publish","type":"post","link":"https:\/\/iesolutions.hu\/en\/linamar-hungary-nyrt-oroshaza-transzformatorallomas-korszerusitese\/","title":{"rendered":"Linamar Hungary Nyrt. \u2013 Orosh\u00e1za, modernisation of transformer station"},"content":{"rendered":"\n<ul class=\"wp-block-list\">\n<li>planning, obtaining authority permits, project preparation<\/li>\n\n\n\n<li>installation of a 20\/0.4-kV room-installed transformer chamber<\/li>\n\n\n\n<li>supply, installation and putting into operation of a 1.6-MVA transformer<\/li>\n\n\n\n<li>manufacturing, supply and replacement of 0.4-kV main distribution equipment, maintaining uninterrupted plant operation.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-medium\"><a href=\"https:\/\/iesolutions.hu\/wp-content\/uploads\/linamar_ies-ref-trafo.jpg\"><img loading=\"lazy\" decoding=\"async\" width=\"300\" height=\"225\" src=\"https:\/\/iesolutions.hu\/wp-content\/uploads\/linamar_ies-ref-trafo-300x225.jpg\" alt=\"\" class=\"wp-image-7416\" srcset=\"https:\/\/iesolutions.hu\/wp-content\/uploads\/linamar_ies-ref-trafo-300x225.jpg 300w, https:\/\/iesolutions.hu\/wp-content\/uploads\/linamar_ies-ref-trafo-195x146.jpg 195w, https:\/\/iesolutions.hu\/wp-content\/uploads\/linamar_ies-ref-trafo-50x38.jpg 50w, https:\/\/iesolutions.hu\/wp-content\/uploads\/linamar_ies-ref-trafo-100x75.jpg 100w, https:\/\/iesolutions.hu\/wp-content\/uploads\/linamar_ies-ref-trafo.jpg 640w\" sizes=\"auto, (max-width:767px) 300px, 300px\" \/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"planning, obtaining authority permits, project preparation installation of a 20\/0.4-kV room-installed transformer chamber supply, installation and putting into operation of a 1.6-MVA transformer manufacturing, supply and replacement of 0.4-kV main distribution equipment, maintaining uninterrupted plant operation.","protected":false},"author":1,"featured_media":7658,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[69,70],"tags":[],"class_list":["post-8912","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-referenciak_tervezes_kivitelezes-en","category-transzformator-allomasok-en"],"_links":{"self":[{"href":"https:\/\/iesolutions.hu\/en\/wp-json\/wp\/v2\/posts\/8912","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/iesolutions.hu\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/iesolutions.hu\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/iesolutions.hu\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/iesolutions.hu\/en\/wp-json\/wp\/v2\/comments?post=8912"}],"version-history":[{"count":1,"href":"https:\/\/iesolutions.hu\/en\/wp-json\/wp\/v2\/posts\/8912\/revisions"}],"predecessor-version":[{"id":8913,"href":"https:\/\/iesolutions.hu\/en\/wp-json\/wp\/v2\/posts\/8912\/revisions\/8913"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/iesolutions.hu\/en\/wp-json\/wp\/v2\/media\/7658"}],"wp:attachment":[{"href":"https:\/\/iesolutions.hu\/en\/wp-json\/wp\/v2\/media?parent=8912"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/iesolutions.hu\/en\/wp-json\/wp\/v2\/categories?post=8912"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/iesolutions.hu\/en\/wp-json\/wp\/v2\/tags?post=8912"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}