Our company participated in the electrical installation of Hungary’s largest biogas plant, as a subcontractor. In this project, we performed the following tasks:
- installation of the plant’s internal medium voltage network and equipment
- installation and connection of 20-kV* distribution cabinets (a total of 11 fields)
- installation and connection of medium voltage operating and protection units
- installation and connection of 3 1,600-kVA, 20/0.4-kV and 1 1,000-kVA, 20/0.4-kV transformers
- installation of medium voltage cable terminations, testing and connection of cables
- installation of medium voltage electric control