- end-to-end technical preparation, project management with the power supplier
- complete electrical planning of a 22/0.42-kV indoor transformer station, permit obtaining and electrical installation
- 22-kV distribution cabinet c/w metering, transformer with 2 branch-offs
- manufacturing, supply and installation of 1 (one) 1,000-kVA and 1 (one) 630-kVA artificial resin insulated transformer and a dual-supply 1,600-A main distribution cabinet
- standby supply for fire cases, operating at 0.4 kV, c/w an automatic switchover mechanism, for the supply of security consumers
- end-to-end commissioning and management of usage permit obtaining process