- Installation of cabling between the transformer station and the cutting unit.
- End-to-end earthwork and landscape restoration.
- Removal of existing 0.4-kV distribution cabinet, installation of a new 1250-A low voltage equipment in its place, c/w connection and commissioning, during a 12-hour out-of-service period.