- construction of transformer room, its electrical separation, installation of false floor system of the medium and low voltage area
- installation and connection of a 22/3.6-kV/0.42-kV 1000-kVA transformer
- supply, installation and connection of a 3.6-kV main distribution cabinet, c/w 3.6-kV consumption metering
- manufacturing, supply and installation of a 0.4-kV, 2,500-A distribution cabinet
- supply, connection and installation of a 337.5-kvar power factor corrector
- testing and commissioning of the system after project completion