- reconstruction of the site’s electric power supply, manufacturing, supply, installation and connection of a new 1,250-A distribution cabinet
- renewal of the electric power consumption metering point
- replacement of cables connected to the ISZTR station
- reconstruction of power factor corrector
- end-to-end commissioning of the system after project completion