INVESTMENT REFERENCES

2022.09.20.
Déli Befektető Projekt Kft. – family house, Törökbálint (from 2022, ongoing)
Construction of a two-storey, almost 500 square meter, premium category new family house 460 square meter terrace, pool, elevator, mechanical engineering room high roofs and walkable or green flat roofs our activity in the project: investor representation and technical inspection
2022.09.20.
Népfőiskola (People’S College) Foundation – Karpátia Event Hall, Lakitelek (ongoing from 2022)
construction of a new multifunctional event hall in a green field investment In a 1-hectare, fully landscaped area, with parking lots and sports fields with different surfaces event space for 1,000 people, grandstand capacity: more than 300 people with full sports technology and event technology design our activities in the project: investment management, technical inspection
2022.09.16.
Family house, Szeged (2018-2022)
Construction of a two-storeys, new, exclusive family house with floor area of 950m2 greenhouse, gym, sauna, billiards room, separate mechanical and separate electrical distribution room floor heating, ceiling cooling-heating, heat pump, ventilation system, air conditioning system, ventilation system, sound technology, shading system, smart house system walkable flat roof, viewing pool, 200m2 terrace, premium floor and wall coverings our activities in […]
2022.09.16.
Family house, Szeged (2017-2022)
Construction of a new exclusive family house with 3 floors, 1500m2 floor area gym, sauna, billiards room, underground garage, separate mechanical and separate electrical distribution room walkable flat roofs, a total of 100m2 balcony, viewing pool, 315m2 terrace, unique floor and wall coverings floor heating, ceiling cooling-heating, heat pump, geothermal energy, air technology, air conditioning system, ventilation system, sound technology, […]
2022.09.16.
Népfőiskola (People’s College) Foundation – Hungarikum Hotel, Lakitelek (2020-2022)
construction of a new hotel building, green field investment in a fully landscaped area of more than 2 hectares, with an ornamental pond, fountain, flower clock, tennis court nearly 6,000 square meters of usable floor space, 79 rooms, several suites, **** superior-classified main building with a wellness department and conference rooms our activities in the project: investor representation, technical inspection
2022.07.15.
Visal Plus Kft. – phase I of the construction of a research laboratory building, Szeged (2021-2022)
construction of a new building more than 2100 m2, four-storey building – biotechnology laboratory with level 2 clean room our activities in the project: investment management, technical inspection total value of the investment: more than HUF 1.2 billion
2022.06.30.
Hansa-Kontakt Inv Kft. – Renovation of Cédrusliget, Lovarda, Szeged (2020-2022)
brown field investment renovation of the cavalry building of the hussar barracks under local protection, with function changing construction of an 850-square-meter Príma food retail store, restaurant, cafe and fitness center our activities in the project: preparation of construction plans, investment management and technical inspection
2022.01.09.
BMSK Zrt. – incubator house, Szeged (2021)
brown field investment creation of an incubator building in the Science Park area of Szeged, by renovating a former barracks building Complete architectural, building mechanical, high- and low-current renovation of a 3,300-square-meter building creation of offices and related rooms, including a room suitable for a biotechnological research and experimental laboratory our activity in the project: investment management and technical inspection […]
2021.11.22.
BMSK Zrt. – Pick Arena, Szeged (2020-2021)
the construction of the multi-functional sports hall with more than 8,000 seats, 29,000 square meters of useful floor space, a training hall with a capacity of 1,500 people and other related facilities our activity in the project: design control total value of the investment: HUF 30 billion
2021.10.30.
NÖF (NÖF National Heritage Development Nonprofit) Kft. – Renovation of Sümeg castle, renovation and reconstruction of the Sümeg monument complex (2020-2021)
renovation of the buildings in the eastern wing of the Sümeg castle (barracks, Várnagyi house, medieval kitchen), reconstruction of the Csabi tower and the „gyilokjáró” on the inner side of the castle wall identical to the original, and the creation of a castle café our activity in the project: technical control and cost expert tasks total value of the investment: […]
2021.10.04.
Lipóti Tóth és Társai Zrt. – bakery plant, Hatvan (2020-2021)
green field investment Construction of a plant with a floor area of 20,000 m2, equipped with automatic production lines using the most modern technology, capable of producing 75-80 tons of bakery products per day our activities in the project: technological technical expert and consulting tasks
2019.12.11.
Municipality of Szeged County City – renovation of elementary schools for energy purposes, Szeged (2018-2020
modernization of 4 primary schools in Szeged (Sándor Bálint, Bonifert Domonkos, Tabán and Sándor Weöres Primary Schools) for energy purposes 11,400 m2 facade thermal insulation, replacement of 850 facade doors and windows, 40,000 m2 interior painting, 6,500 m2 roof thermal and waterproofing, installation of a 136.7 kWp solar panel system, construction of heat centers, modernization of heating – replacement of […]
2019.12.02.
Ópusztaszer Municipality – geothermal project, Ópusztaszer (2019)
construction of a local geothermal system to supply buildings of local interest with thermal energy drilling of a geothermal well with a depth of 1,600 meters 1,700 meters of pipe laying, construction of 8 heating centers our activity in the project: technical inspection total value of the investment: HUF 208.5 million
2016.10.07.
Szeged (a city with a county rank) – review of plans of schools, kindergartens, nurseries (2015 – 2016)
revise the plans on the modernisation of the power supply and architectural construction of 13 elementary schools, 5 kindergartens and 3 nurseries in Szeged coordinate planning processes act as an expert in the compilation of public procurement documents total self-cost of the projects: HUF 3.6 billion
2016.10.04.
Cobex Hungária Kft. – corn cob storage facility – Hódmezővásárhely (2015-2016)
a corn cob storage facility with a floor area of 2,400 m2 and a high ceiling, c/w its ancillary facilities compilation of building permit, tender and detailed construction plans, bidding process for contractor selection, project supervision technical inspection cost of the project: HUF 270 million
2016.10.04.
J4 Services Facility – Budapest, 16th District (2015-2016)
a facility offering a wide range of services, on a floor area of 600 m2, with a facility part having a two-floor structure compilation of modified building permit and detailed construction plans, bidding process for contractor selection, project supervision technical inspection cost of the project: HUF 150 million
2016.10.04.
Somogyi Udvar Kft. – a 60-room 4-star hotel (2010-2013)
a 4-star hotel and the connected facilities (underground parking area, restaurant, bar, coffee bar, wellness unit, shops and offices) in the city centre; total floor area: 9,300 m2 bid preparation project implementation management technical supervision project communication project cost price: HUF 2 billion
2016.10.04.
CE Glass Industries – Szatymaz, implementation of a new manufacturing and logistics base (2011-2012)
greenfield project implementation of a 22,000-square-metre glass industry manufacturing hall, a 1,500-square-metre office building and ancillary facilities revision of detailed construction drawings project management technical inspection cost of the project: HUF 2.5 billion
2016.10.04.
Délép Ipari Park – Szeged, public utility network development (2008-2010)
preparation of the renewal and development of the public utility infrastructure of a 41-hectare area organisation of planning, tender preparation revision of working plans bidding project management performance of communication tasks technical supervision
2016.10.04.
Huszár 99 Kft. – Kecskemét, Press Centre building renewal (2008-2009)
as the re-use of the former Press Centre building in the city of Kecskemét, construction of shops and luxury apartments in the city centre, on 3,500 square metres complete project preparation and implementation management preparation of plans for authority permit obtaining project cost price: HUF 350 million