2022.07.22.
Drive system overhaul of water circulation systems – strong-current drafting and implementation
2021.06.30.
Modernization and energy-rationalization of lighting bodies in Szeged heating stations
2020.08.22.
20/0,4 kV-os Transzformátor állomás karbantartása ABB KÖF elosztó-berendezés (5 mező) 5 db 22/0,42kV transzformátor 4db 0,4kV-os főelosztó berendezés
2020.03.02.
Modernization of heating stations in Szeged’s Felsőváros II., Odessza I., Odessza II., Tarján IV. and Észak 1/B districts Strong current planning and drafting Tasks associated with electrical modernization and strong current work Drafting and building of strong current distributors Drafting and building of installation networks
2020.02.28.
Building of 2MVA nominal power transformers of 11/0,42kV configuration in concrete housings, plus medium-current instrumentation room Drafting and implementation of new primary distributor for factory floor
2019.12.30.
Installation of lightning protection devices Installation of internal electrical network Installation of lamps and lighting elements Installation, setup and live testing of distributor junctions Maintenance measurements
2019.12.04.
Electrical repairwork on utility buildings of duck-rearing facility Installation of concrete-housed electrical receive-send station Ground cable connection for supplying various buildings Installation of protective ground for buildings Installation of space lighting elements Electrical repair work on servicing buildings Control measurements
2019.10.30.
Decommissioning of existing internal electrical network Installation of new electrical network Installation of new lamps and lighting Installation of new distribution junctions, testing Control measurements
2019.05.15.
Installation of a new energy supply system for the new paprika drying facility of the TEAM WORK Social Union of Mórahalom Drafting and installation of 400kVA transformer station, 22kV supply cable and medium current measuring station
2018.12.31.
Electrical drafting work for internal remodeling of existing warehouse Drafting of new internal electrical network and primary distributor unit
2018.05.17.
Installation of two 6/0,41kV 1600kVA synthetic resin insulated transformers Expansion of existing pair of SM6 devices Installation of two RM6 NB-D-I units Installation of internal 22kV and 0,4kV cable tracks for the building Manufacturing and installation of transformer temperature protection cabinet and attached data collector Repair and installation of Prisma Plus P type 2500A 14 field 0,4kV primary distributor Installation […]