DESIGN AND IMPLEMENTATION

2022.08.09.
Váll-Ker Kft. (Makó) – in progress
2022.07.22.
Szegedi Távfűtő Kft. (Szeged) – building 1/B VFD (Variable Frequency Drive) distribution project
Drive system overhaul of water circulation systems – strong-current drafting and implementation
2021.06.30.
Szegedi Távfűtő Kft. (Szeged) – modernization of lighting in heating stations
Modernization and energy-rationalization of lighting bodies in Szeged heating stations
2020.03.02.
Szegedi Távfűtő Kft. (Szeged) – modernization of heating stations
Modernization of heating stations in Szeged’s Felsőváros II., Odessza I., Odessza II., Tarján IV. and Észak 1/B districts Strong current planning and drafting Tasks associated with electrical modernization and strong current work Drafting and building of strong current distributors Drafting and building of installation networks
2020.02.28.
KALLE Hungaria Kft. (Budapest) – Power expansion and transition to an expanded 11kV system
Building of 2MVA nominal power transformers of 11/0,42kV configuration in concrete housings, plus medium-current instrumentation room Drafting and implementation of new primary distributor for factory floor
2019.12.30.
Chili Produkt Kft. (Szeged) – electrical overhaul of warehouse and packaging plant
Installation of lightning protection devices Installation of internal electrical network Installation of lamps and lighting elements Installation, setup and live testing of distributor junctions Maintenance measurements
2019.12.04.
Hungerit Zrt. (Tiszakécske) – Electrical utilities repair on duck-rearing site
Electrical repairwork on utility buildings of duck-rearing facility Installation of concrete-housed electrical receive-send station Ground cable connection for supplying various buildings Installation of protective ground for buildings Installation of space lighting elements Electrical repair work on servicing buildings Control measurements
2019.10.30.
Könyvmolyképző Kiadó Kft. (Sándorfalva) – Electrical repair work on book warehouse
Decommissioning of existing internal electrical network Installation of new electrical network Installation of new lamps and lighting Installation of new distribution junctions, testing Control measurements
2019.05.15.
BAUSZER Kft. (Mórahalom) – Drafting and delivery of BHTR station
Installation of a new energy supply system for the new paprika drying facility of the TEAM WORK Social Union of Mórahalom Drafting and installation of 400kVA transformer station, 22kV supply cable and medium current measuring station
2018.12.31.
CBA (Mórahalom) – Modernization of power supply
Electrical drafting work for internal remodeling of existing warehouse Drafting of new internal electrical network and primary distributor unit
2018.05.17.
Guardian Orosháza Kft. (Orosháza) – Expansion of power distribution system
Installation of two 6/0,41kV 1600kVA synthetic resin insulated transformers Expansion of existing pair of SM6 devices Installation of two RM6 NB-D-I units Installation of internal 22kV and 0,4kV cable tracks for the building Manufacturing and installation of transformer temperature protection cabinet and attached data collector Repair and installation of Prisma Plus P type 2500A 14 field 0,4kV primary distributor Installation […]
2018.05.17.
Heves Megyei Vízmű Zrt. (Hatvan) – Reconstruction of 22kV switching
station at water utility site
Maintenance and 9-parameter oil analysis of two Ganz AKNF 400/25 transformers Installation and commissioning of RM6 IDD 24kV device Creation of internal 22kV cable tracks for relevant buildings Connection to existing 22kV network
2018.05.17.
Szentes-Frigo Kft. (Szentes) – power supply expansion, transition
to 22kV supply
2017.06.09.
Haring Kft. (Szeged) – Implementation of transformer station for
photovoltaic cluster
Gallery
2017.06.09.
Haring Kft. (Szeged) – Complete drafting and certification of four
photovoltaic plants
Drafting and certification of four 499kW photovoltaic plants and power cabling MKEH certification process Drafting of electrical utility provider connection plans
2017.06.09.
Magyar Suzuki Zrt. (Esztergom) – Retrofit replacement of
medium and low voltage breakers
Gallery
2017.06.09.
LightTech Lámpatechnológiai Kft. (Dunakeszi) –
power capacity expansion of transformer station
Gallery
2017.06.08.
Prettl Hungária Kft. (Szekszárd) – power capacity expansion and transition to 22kV tap supply
Gallery
2016.10.21.
Fléma Snacks Kft. (Mórahalom) – Transition from low voltage to medium voltage power use
Gallery
2016.10.04.
Mars Magyarország Kft. (Csongrád-Bokros) – Relocation of technology cooling equipment pool, establishment of electric power supply system
Gallery
2016.10.04.
Ferroép-Szer Kft. (Szeged) – installation of a 22/0.42 kV transformer station in Szeged Nova Shopping Centre
Gallery
2016.10.04.
Plazmaszolgálat Kft. (Szeged) – Electrical installation tasks for power networks and systems
Gallery
2016.10.04.
ContiTech Fluid Automotive Hungária Kft. (Vác) – Alteration and expansion of the existing FE distribution cabinet, in several phases
end-to-end maintenance of the equipment, checking of the protection of circuit breakers, replacement of faulty protections and devices installation and commissioning of 2 new 1000-A branch-offs with a circuit breaker creation of a power generator switchover automatism, using the existing supply line circuit breakers alteration of the fire protection switch-off system, installation of shunt releases
2016.10.04.
OERG Kft. (Ózd) – Power centre transformer station: building construction and electrical installation
2016.10.04.
Meditop Kft. (Pilisborosjenő) – Electrical jobs in the enlargement of a medicine plant
end-to-end planning and electrical installation of a 22/0.42-kV compact transformer station (1,000 kVA) renewal of the site’s entire low voltage electrical network. plant enlargement, end-to-end electric power network and system electrical installation from scratch
2016.10.04.
Linamar Zrt. (Orosháza) – Transformer: building construction and electrical installation
Gallery
2016.10.04.
Linamar Zrt. (Orosháza) – performance increase in cutting unit
Installation of cabling between the transformer station and the cutting unit. End-to-end earthwork and landscape restoration. Removal of existing 0.4-kV distribution cabinet, installation of a new 1250-A low voltage equipment in its place, c/w connection and commissioning, during a 12-hour out-of-service period.
2016.10.04.
CE Glass Zrt. – Provision of power supply to the heat treating furnace
Gallery
2016.10.04.
Kurucsai és Társa Kft. (Kistelek) – Installation of a transformer station
Gallery
2016.10.04.
Mercedes Benz (Kecskemét) – medium voltage electrical installation jobs, transformer station installation
Gallery
2016.10.04.
Taugép Kft. (Deszk) – reconstruction of the site’s electric power supply
reconstruction of the site’s electric power supply, manufacturing, supply, installation and connection of a new 1,250-A distribution cabinet renewal of the electric power consumption metering point replacement of cables connected to the ISZTR station reconstruction of power factor corrector end-to-end commissioning of the system after project completion
2016.10.04.
Gyöngyös Industrial Park (Gyöngyös) – installation of a transformer station
Gallery
2016.10.04.
GlaxoSmithKline Kft. (Gödöllő) – alteration of the power factor corrector
technical revision and alteration of 2 1,500-kvar power factor correctors
2016.10.04.
Fémiksz Kft (Ózd) – installation of power factor corrector
337.5-kVAr – 7% power factor corrector: supply, installation and commissioning, with the possibility for 100-kVAr expansion
2016.10.04.
Linamar Hungary Zrt. (Orosháza) – enlargement of electric power supply of the manufacturing plant
Gallery
2016.10.04.
Municipal Government of Szeged (a city with a county rank) and Szegedi Közlekedési Kft. – “Improvement of Community Transport in Szeged” Project
Between 2010-2012, our company participated in the implementation of the large project running under the title “Improvement of Electric Transport in the City of Szeged”, as a subcontractor, performing the following jobs: Gallery
2016.10.03.
FÉMIKSZ Kft. (Ózd) – transformer station renewal
renewal of existing transformer station supply and commissioning of a 20/0.4 kV transformer
2016.10.03.
Biogas power plant (Szarvas)
Our company participated in the electrical installation of Hungary’s largest biogas plant, as a subcontractor. In this project, we performed the following tasks: installation of the plant’s internal medium voltage network and equipment installation and connection of 20-kV* distribution cabinets (a total of 11 fields) installation and connection of medium voltage operating and protection units installation and connection of 3 […]
2016.10.03.
GlaxoSmithKline Kft. (Gödöllő)
Gallery
2016.10.03.
Keselyűs-Hús Kft. (Szekszárd) – transformer station
Gallery
2016.10.03.
IKG Manufacturing Hall – Mórahalom, Complete electric power engineering and installation for a 1000-m2 hall
Gallery
2016.10.03.
Conti-Tech Hungária Kft. – Makó, implementation of the company’s own medium and low voltage transformer station
Gallery
2016.10.03.
ASS Berendezési Rendszerek Bt. – Makó, implementation of the company’s own medium and low voltage transformer station
project preparation installation of medium-voltage consumer cables supply, installation and putting into operation of one 1-MVA transformer manufacturing, supply and replacement of 0.4-kV main distribution equipment planning of change of incoming power voltage level, management of project with electricity supplier (EDF DÉMÁSZ)
2016.10.03.
Diamant Malom – Baja, implementation of the company’s own medium and low voltage transformer station
planning, obtaining authority permits, project preparation supply, installation and connection of a 10/0.4-kV transformer supply, on-site installation and putting into operation of a 10-kV power distribution equipment 0.4-kV ancillary power supply installation planning of change of incoming power voltage level, management of project with electricity supplier (EDF DÉMÁSZ)
2016.10.03.
Mercedes-Benz Manufacturing Hungary Kft. – Kecskemét, installation of main distribution equipment
installation of 20-kV, 2500-A and 1250-A main distribution and distribution equipment (total number of fields: 31) Location, installation and connection of the system’s short circuit protection and star topology management equipment
2016.10.03.
Dunapack Papírgyár – Dunaújváros, Installation of the new “PM7” paper factory’s power supply system
2016.10.03.
Light Tech Lámpatechnológiai Kft. (Dunakeszi)
complete maintenance of medium and low voltage (20/0.4-kV) transformer stations operation of the station, service availability
2016.10.03.
Linamar Hungary Nyrt. – Orosháza, modernisation of transformer station
2016.10.03.
Hankook Tyres Hungary Kft. – Tatabánya, installation of the new tyre factory’s power supply system
supervision of the installation of 6-kV and 0.4-kV power distribution systems installation, connection and putting into operation of 6-kV distributors in 51 fields installation, connection and putting into operation of 16 transformers (6/0.4 kV; 1000-3150 kVA)
2016.10.03.
Mediterrán Magyarország Kft. – Kunszentmiklós, Installation of the new roof tile manufacturing plant’s own medium/low voltage transformer station
planning, obtaining authority permits and installation of a new 20-kV power supply line supply, installation and putting into operation of a 20/0.4-kV prefabricated concrete-housed transformer
2016.10.03.
Nordenia Hungary Kft. – Szada, implementation of the company’s own medium and low voltage transformer station
planning, obtaining authority permits, project preparation complete renewal of 20/0.4-kV room-installed transformer station to enable the changing of incoming electric power voltage level – including planning, obtaining authority permits and installation supply, installation and putting into operation of 2 1.6-MVA transformers, 3 items of field medium voltage switching equipment planning of change of incoming power voltage level, management of project […]
2016.10.03.
Masterfoods Magyaroszág Gyártó Kft. – Csongrád-Bokros, modernisation of low-voltage distribution
2016.09.24.
Unilever Magyarország Kft. – Röszke, implementation of the company’s own medium and low voltage transformer station