2016.10.04.
technical revision and alteration of 2 1,500-kvar power factor correctors
2016.10.04.
337.5-kVAr – 7% power factor corrector: supply, installation and commissioning, with the possibility for 100-kVAr expansion
2016.10.04.
2016.10.04.
Between 2010-2012, our company participated in the implementation of the large project running under the title “Improvement of Electric Transport in the City of Szeged”, as a subcontractor, performing the following jobs: Gallery
2016.10.03.
renewal of existing transformer station supply and commissioning of a 20/0.4 kV transformer
2016.10.03.
Our company participated in the electrical installation of Hungary’s largest biogas plant, as a subcontractor. In this project, we performed the following tasks: installation of the plant’s internal medium voltage network and equipment installation and connection of 20-kV* distribution cabinets (a total of 11 fields) installation and connection of medium voltage operating and protection units installation and connection of 3 […]
2016.10.03.
2016.10.03.
2016.10.03.
2016.10.03.
2016.10.03.
project preparation installation of medium-voltage consumer cables supply, installation and putting into operation of one 1-MVA transformer manufacturing, supply and replacement of 0.4-kV main distribution equipment planning of change of incoming power voltage level, management of project with electricity supplier (EDF DÉMÁSZ)