2019.05.15.
Installation of a new energy supply system for the new paprika drying facility of the TEAM WORK Social Union of Mórahalom Drafting and installation of 400kVA transformer station, 22kV supply cable and medium current measuring station
2018.05.17.
Installation of two 6/0,41kV 1600kVA synthetic resin insulated transformers Expansion of existing pair of SM6 devices Installation of two RM6 NB-D-I units Installation of internal 22kV and 0,4kV cable tracks for the building Manufacturing and installation of transformer temperature protection cabinet and attached data collector Repair and installation of Prisma Plus P type 2500A 14 field 0,4kV primary distributor Installation […]
2018.05.17.
2017.06.09.
2017.06.09.
2017.06.08.
2016.10.21.
2016.10.04.
2016.10.04.
2016.10.04.
2016.10.04.
2016.10.04.
2016.10.03.
renewal of existing transformer station supply and commissioning of a 20/0.4 kV transformer
2016.10.03.
Our company participated in the electrical installation of Hungary’s largest biogas plant, as a subcontractor. In this project, we performed the following tasks: installation of the plant’s internal medium voltage network and equipment installation and connection of 20-kV* distribution cabinets (a total of 11 fields) installation and connection of medium voltage operating and protection units installation and connection of 3 […]
2016.10.03.
2016.10.03.
2016.10.03.
project preparation installation of medium-voltage consumer cables supply, installation and putting into operation of one 1-MVA transformer manufacturing, supply and replacement of 0.4-kV main distribution equipment planning of change of incoming power voltage level, management of project with electricity supplier (EDF DÉMÁSZ)
2016.10.03.
Diamant Malom – Baja, implementation of the company’s own medium and low voltage transformer station
planning, obtaining authority permits, project preparation supply, installation and connection of a 10/0.4-kV transformer supply, on-site installation and putting into operation of a 10-kV power distribution equipment 0.4-kV ancillary power supply installation planning of change of incoming power voltage level, management of project with electricity supplier (EDF DÉMÁSZ)
2016.10.03.
2016.10.03.
complete maintenance of medium and low voltage (20/0.4-kV) transformer stations operation of the station, service availability
2016.10.03.
2016.10.03.
supervision of the installation of 6-kV and 0.4-kV power distribution systems installation, connection and putting into operation of 6-kV distributors in 51 fields installation, connection and putting into operation of 16 transformers (6/0.4 kV; 1000-3150 kVA)
2016.10.03.
planning, obtaining authority permits and installation of a new 20-kV power supply line supply, installation and putting into operation of a 20/0.4-kV prefabricated concrete-housed transformer
2016.10.03.
planning, obtaining authority permits, project preparation complete renewal of 20/0.4-kV room-installed transformer station to enable the changing of incoming electric power voltage level – including planning, obtaining authority permits and installation supply, installation and putting into operation of 2 1.6-MVA transformers, 3 items of field medium voltage switching equipment planning of change of incoming power voltage level, management of project […]
2016.09.24.