Guardian Orosháza Kft. (Orosháza) – Expansion of power distribution system
Installation of two 6/0,41kV 1600kVA synthetic resin insulated transformers Expansion of existing pair of SM6 devices Installation of two RM6 NB-D-I units Installation of internal 22kV and 0,4kV cable tracks for the building Manufacturing and installation of transformer temperature protection cabinet and attached data collector Repair and installation of Prisma Plus P type 2500A 14 field 0,4kV primary distributor Installation […]
2016.10.03.
Biogas power plant (Szarvas)
Our company participated in the electrical installation of Hungary’s largest biogas plant, as a subcontractor. In this project, we performed the following tasks: installation of the plant’s internal medium voltage network and equipment installation and connection of 20-kV* distribution cabinets (a total of 11 fields) installation and connection of medium voltage operating and protection units installation and connection of 3 […]
2016.10.03.
ASS Berendezési Rendszerek Bt. – Makó, implementation of the company’s own medium and low voltage transformer station
project preparation installation of medium-voltage consumer cables supply, installation and putting into operation of one 1-MVA transformer manufacturing, supply and replacement of 0.4-kV main distribution equipment planning of change of incoming power voltage level, management of project with electricity supplier (EDF DÉMÁSZ)
2016.10.03.
Diamant Malom – Baja, implementation of the company’s own medium and low voltage transformer station
planning, obtaining authority permits, project preparation supply, installation and connection of a 10/0.4-kV transformer supply, on-site installation and putting into operation of a 10-kV power distribution equipment 0.4-kV ancillary power supply installation planning of change of incoming power voltage level, management of project with electricity supplier (EDF DÉMÁSZ)
2016.10.03.
Hankook Tyres Hungary Kft. – Tatabánya, installation of the new tyre factory’s power supply system
supervision of the installation of 6-kV and 0.4-kV power distribution systems installation, connection and putting into operation of 6-kV distributors in 51 fields installation, connection and putting into operation of 16 transformers (6/0.4 kV; 1000-3150 kVA)
2016.10.03.
Mediterrán Magyarország Kft. – Kunszentmiklós, Installation of the new roof tile manufacturing plant’s own medium/low voltage transformer station
planning, obtaining authority permits and installation of a new 20-kV power supply line supply, installation and putting into operation of a 20/0.4-kV prefabricated concrete-housed transformer
2016.10.03.
Nordenia Hungary Kft. – Szada, implementation of the company’s own medium and low voltage transformer station
planning, obtaining authority permits, project preparation complete renewal of 20/0.4-kV room-installed transformer station to enable the changing of incoming electric power voltage level – including planning, obtaining authority permits and installation supply, installation and putting into operation of 2 1.6-MVA transformers, 3 items of field medium voltage switching equipment planning of change of incoming power voltage level, management of project […]