DESIGN AND IMPLEMENTATION

2016.10.04.
Meditop Kft. (Pilisborosjenő) – Electrical jobs in the enlargement of a medicine plant
end-to-end planning and electrical installation of a 22/0.42-kV compact transformer station (1,000 kVA) renewal of the site’s entire low voltage electrical network. plant enlargement, end-to-end electric power network and system electrical installation from scratch
2016.10.04.
Linamar Zrt. (Orosháza) – performance increase in cutting unit
Installation of cabling between the transformer station and the cutting unit. End-to-end earthwork and landscape restoration. Removal of existing 0.4-kV distribution cabinet, installation of a new 1250-A low voltage equipment in its place, c/w connection and commissioning, during a 12-hour out-of-service period.
2016.10.04.
Taugép Kft. (Deszk) – reconstruction of the site’s electric power supply
reconstruction of the site’s electric power supply, manufacturing, supply, installation and connection of a new 1,250-A distribution cabinet renewal of the electric power consumption metering point replacement of cables connected to the ISZTR station reconstruction of power factor corrector end-to-end commissioning of the system after project completion
2016.10.04.
Municipal Government of Szeged (a city with a county rank) and Szegedi Közlekedési Kft. – “Improvement of Community Transport in Szeged” Project
Between 2010-2012, our company participated in the implementation of the large project running under the title “Improvement of Electric Transport in the City of Szeged”, as a subcontractor, performing the following jobs: Gallery