DESIGN AND IMPLEMENTATION

2016.10.03.
Biogas power plant (Szarvas)
Our company participated in the electrical installation of Hungary’s largest biogas plant, as a subcontractor. In this project, we performed the following tasks: installation of the plant’s internal medium voltage network and equipment installation and connection of 20-kV* distribution cabinets (a total of 11 fields) installation and connection of medium voltage operating and protection units installation and connection of 3 […]
2016.10.03.
ASS Berendezési Rendszerek Bt. – Makó, implementation of the company’s own medium and low voltage transformer station
project preparation installation of medium-voltage consumer cables supply, installation and putting into operation of one 1-MVA transformer manufacturing, supply and replacement of 0.4-kV main distribution equipment planning of change of incoming power voltage level, management of project with electricity supplier (EDF DÉMÁSZ)
2016.10.03.
Diamant Malom – Baja, implementation of the company’s own medium and low voltage transformer station
planning, obtaining authority permits, project preparation supply, installation and connection of a 10/0.4-kV transformer supply, on-site installation and putting into operation of a 10-kV power distribution equipment 0.4-kV ancillary power supply installation planning of change of incoming power voltage level, management of project with electricity supplier (EDF DÉMÁSZ)
2016.10.03.
Mercedes-Benz Manufacturing Hungary Kft. – Kecskemét, installation of main distribution equipment
installation of 20-kV, 2500-A and 1250-A main distribution and distribution equipment (total number of fields: 31) Location, installation and connection of the system’s short circuit protection and star topology management equipment