DESIGN AND IMPLEMENTATION

2016.10.03.
Hankook Tyres Hungary Kft. – Tatabánya, installation of the new tyre factory’s power supply system
supervision of the installation of 6-kV and 0.4-kV power distribution systems installation, connection and putting into operation of 6-kV distributors in 51 fields installation, connection and putting into operation of 16 transformers (6/0.4 kV; 1000-3150 kVA)
2016.10.03.
Mediterrán Magyarország Kft. – Kunszentmiklós, Installation of the new roof tile manufacturing plant’s own medium/low voltage transformer station
planning, obtaining authority permits and installation of a new 20-kV power supply line supply, installation and putting into operation of a 20/0.4-kV prefabricated concrete-housed transformer
2016.10.03.
Nordenia Hungary Kft. – Szada, implementation of the company’s own medium and low voltage transformer station
planning, obtaining authority permits, project preparation complete renewal of 20/0.4-kV room-installed transformer station to enable the changing of incoming electric power voltage level – including planning, obtaining authority permits and installation supply, installation and putting into operation of 2 1.6-MVA transformers, 3 items of field medium voltage switching equipment planning of change of incoming power voltage level, management of project […]
Integrated Engineering Solutions Kft.
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.